A turnkey investment opportunity is available for the acquisition of a large-scale hybrid renewable energy complex located in the Qapshaqai region (Almaty Region, Kazakhstan) along the Ili River. The project synergistically combines baseline solar power generation with high-flexibility pumped storage hydro, delivering a fully dispatchable, grid-stabilizing energy ecosystem.
Key Project Parameters
- Solar PV Capacity: 800 MW
- Pumped Storage Hydropower (PSPP) Capacity: 300 MW
- Location: Ili River, downstream of the Qapshaqai Reservoir (offering optimal topography for the upper reservoir and high solar irradiance)
- Operational Model: Daytime utilization of self-generated solar power to pump water to the upper reservoir; peak-hour water discharge during morning and evening price surges to supply high-value electricity to the grid.
Investment Highlights & Strategic Value
- Grid Stability & Dispatchability: The integration of 300 MW PSPP mitigates solar intermittency, transforming variable renewable energy into a 24/7 guaranteed, fully dispatchable power supply.
- Peak Shaving & Premium Arbitrage: Energy sales are strategically shifted to peak demand hours (morning and evening load peaks in Southern Kazakhstan’s power grid), securing maximum power purchase tariffs.
- Prime Infrastructure & Hydrological Site: The site features exceptional hydro-potential, established logistics, and close proximity to key national high-voltage transmission lines for seamless grid integration.
- Ancillary System Services: The complex is positioned to offer essential system frequency and voltage regulation services to the National Grid Operator (KEGOC), unlocking additional recurring revenue streams.
Available Project Documentation
A comprehensive project package is available for qualified investors to conduct Due Diligence:
- Feasibility Study (FS) & Financial Model: Complete with NPV, IRR, and payback period projections.
- Engineering Layouts & Technical Designs: Detailed layouts for the upper reservoir, powerhouse, and 800 MW solar field.
- Hydrological & Water Balance Analysis: Comprehensive studies on the Ili River’s water flow and seasonal management.
- Permitting & Grid Connection Roadmap: Grid connection assessment and regulatory approval roadmap for Kazakhstan’s energy market.
Full documentation and data room access are available upon request for accredited investors.