The acquisition of a hydropower asset is a strategic long-term investment. Based on current market listings, such as those found on professional portals, investors can choose from three distinct categories. At Hydro News, we categorize these assets to help you match your capital to the right project scale.
HPP-2 (Zugdidi District, Under Construction) • Capacity: 3.3 MW (2 units). • Price: 4,400,000 USD (Plot + Equipment). • Status: Completion planned for 2026
HPP-3 (Zugdidi District, Project) • Capacity: 5 MW. • Status: Design and development stage
$9
Lodnari" Plot • Capacity: ≈ 4.0 MW. • Head: 161.2 m. • Offer: Sale of the plot or "turnkey" construction
$32
I.
$32
Kheva" Project (Cascade) • Total Capacity: ~7.0 MW (Kheva-1: 1.98 MW + Kheva-2: 5.05 MW). • Head: 700 m (Upper) / 155 m (Lower). • Offer: Sale of rights, co-investment (70/30, 50/50)
HPP-1 (Zugdidi District, Operating) • Capacity: 1.96 MW. • Price: 5,800,000 USD. • Status: In operation since 2023
Akavreta" Project (Large Scale) • Capacity: 25.02 MW. • Head: 253 m
Akavreta" Plot (Small HPP) • Head: 42.5 m. • Output: 8–10 million kWh/year. • Offer: Sale of plot for a small HPP
Akavreta–Lodnari" Project (Combined) • Output: 69.4 million kWh/year. • Features: Two units housed in a single building
Gudauri" Project • Capacity: 5.09 MW. • Features: High-head, no dam (run-of-river), export potential
Shrosha – Dzirula" Cascade • Capacity: ≈ 18.4 MW. • Features: No dam, implementation period 18–28 months
Kyrgyzstan 11. Arym River Cascade • Capacity: ≈ 40.7 MW (4 stages: 11.0 / 9.6 / 8.4 / 11.7 MW). • Payback Period: 4.5–6 years. • Head: Total ≈ 1065 m
Kazakhstan 13. Mini-HPP (Almaty Region, Non-Operational) • Capacity: 800 kW (potential up to 1 MW). • Assets: 93 hectares of land (owned). • Status: Requires dam reconstruction; previously operated for 4 months
Have questions? Contact us.
Our experts are ready to provide detailed answers and consult you on your project. We ensure a prompt and professional response to every inquiry.
The Big Three: Choosing the Right Hydro Turbine
13.01.2026
Комментариев нет
The Heart of the Plant Choosing the correct turbine is the most critical decision in hydropower engineering. The choice depends entirely on two factors: Head ...
Read More →
The Gravity Battery: Why Pumped Hydro is the Only Sovereign Solution for Global Energy Security
19.01.2026
Комментариев нет
Оставьте комментарий / Editors Pick, Stock Market / От asumb The Gravity Battery: Why Pumped Hydro is the Only Sovereign Solution for Global Energy Security The Battery Myth vs. Natural ...
Read More →
Why Pumped Storage Hydropower is the Ultimate Energy Security Solution
19.01.2026
Комментариев нет
Discover why PSH is the only reliable «gravity battery» for grid stability. Learn why chemical batteries and nuclear risks can’t match the safety and scale ...
Read More →
The Giant of Storage: Technical Overview of Bath County PSH
19.01.2026
Комментариев нет
IThe Bath County Pumped Storage Station is a true engineering marvel. It is located in Virginia, USA. Many experts call it the «World’s Largest Battery.» ...
Read More →
Site Integrity in Pumped Storage Hydropower: The Foundation of Geological and Geodetic Surveys
19.01.2026
Комментариев нет
The viability of a Pumped Storage Hydropower (PSH) project depends entirely on the structural integrity of the site. Before a single cubic meter of concrete ...
Read More →
Scaling to the Max: Lessons from the World’s Largest PSH Plant in China
19.01.2026
Комментариев нет
The Apex of Pumped Storage The Fengning Pumped Storage Power Plant in Hebei Province is a record-breaking achievement. With a total capacity of 3,600 MW ...
Read More →